Launching the third stage of the Heating Equipment Factory

 In Uncategorized

Monthly study of socio-political stability of the region is regularly held fund “Petersburg policy” since 2012. The level is determined by the stability of experts on 10-point scale, where 10 – the maximum score, 1 – minimum. Increasing the capacity of the plant “Heating equipment” Corporation “Thermex” has become one of the key events on the economy of the Leningrad region, will allow the region score 8.1 points and take a leading position in the ranking.
Recall that the investment in the construction of the third stage of the plant “Heating equipment” Corporation “Thermex” are estimated at 1.8 billion rubles. Total production area increased by a third and is 60 000 m². The volume of production has increased to more than 2 million water heaters per year. Due to a more modern equipment manufacturing production speed increased almost twice – every 15 seconds off the belt a new water heater. Today it is the largest in terms of production plant for the production of water heaters in Russia and one of the most advanced in the world.

Reference
Thermex Corporation is a major international trade and industrial holding company and a leader on the market of water heating equipment in Russia. The Corporation’s products are exported to more than 70 countries. The company staff currently is more than 2,000 people.

Thermex Corporation includes 27 enterprises with 104 branches and representative offices in Russia, CIS and far abroad. Business units of the Corporation are engaged in manufacture, sales, logistics and service of heating and water heating equipment, namely: electric water heaters, electric convector heaters, gas-fired boilers, gas water heaters, heating radiators, industrial boilers and accessories for the heating and water heating equipment.

The Heating Equipment Factory located in the city of Tosno in the Leningrad Region, is the main production site of Thermex Corporation in Russia. The first stage of the factory started in 2007, the second stage was constructed in 2010.

Recent Posts

Leave a Comment

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search